Selected recent commercial groundworks and civil engineering schemes — filterable by sector. Each case study includes scope, contract value, programme outcome and engineering metrics.

Logistics Hub Phase 2
Full enabling works, deep drainage and FM2-grade concrete slab pour for a 45,000 sq ft distribution unit, delivered four weeks ahead of programme.

M6 Junction 18 Upgrade
S278 highway widening with full reconstruction of two slip roads, drainage, kerbing and surfacing under live traffic management.

Midpoint Retail Park
Bulk earthworks, RC pad foundations and external works package for a six-unit retail terrace anchored by a national grocer.

Northfield SuDS Scheme
Design-and-build SuDS attenuation scheme to relieve flood-risk in a Category 3 catchment, including swales, headwalls and adoptable drainage.

Ashbrook Housing Phase 1
Site-wide enabling works, foul and surface water drainage, and 280 plot foundations for a 186-unit residential development.

Harlow Data Centre Pad
Enabling works and RC piled raft for a hyperscale data centre campus. 14 m deep capping beams and 24,000 m³ cut-and-fill earthworks.